
Up to 1 MW per truck
Up to 12 truck charge points, designed around the 45-minute driving break. Charge points for cars come on top.

in progress Opening planned for 2027
Truck Center, charging park, energy and service are coming together – well connected on the A7 and A96, near Memmingen Airport.
Charging in Heimertingen is not yet possible: the charging park is in progress, with opening planned for 2027.
The site lies on two motorways and near Memmingen Airport – in the heart of southern Germany.
Via the A7 it is about 50 km to Ulm and 45 km to Kempten; via the A96 about 120 km to Munich and 75 km to Lindau on Lake Constance.
Heimertingen is a pilot and reference project. What is built here is intended to follow at further transport hubs in Germany and Europe.
Map data © OpenStreetMap contributors
Charging, rest, refreshments, washing – while the vehicle charges, drivers will find everything they need here.

Up to 12 truck charge points, designed around the 45-minute driving break. Charge points for cars come on top.

The 24/7 kiosk is set to offer food, drinks and a place to catch your breath. Day and night.

Sanitary facilities right at the charging park, not at the far end of the rest area.

The truck wash will be right on site. Charge and wash in a single stop.

The charging park will use renewable energy from the 30 MW solar park about 300 m away – within sight.
The site serves as a reference project for further expansion. More sites are planned at key transport hubs in Germany and Europe.
Talk to us about the next siteWhat drivers and fleet operators should know before the opening.
Question not listed? Write to usNo, not yet. The charging park is in progress, with opening planned for 2027. Planned are charge points with up to 1 MW for e-trucks and additional charge points for cars. Once construction starts, the project status on this page will be updated.
In Heimertingen in the district of Unterallgäu (Bavaria, Germany), on the A7 a few kilometres north of the Memmingen motorway junction with the A96 and near Allgäu Airport Memmingen. The map shows the location deliberately approximately. The address of Truck-PowerDest GmbH, Alpenstraße 10 in Heimertingen, is the registered office, not the charging park.
A high-power charging park with up to 1 MW per truck charge point, rest and supply facilities with a 24/7 kiosk, sanitary facilities, a truck wash, service for electric commercial vehicles and a Truck Center. The power is to come from the 30 MW solar park about 300 m away.
Truck-PowerDest GmbH, based in Heimertingen. Its managing shareholders are Johannes Demmeler, Andreas Müller and Thomas Henkel, who bring together experience from DEMMELER Maschinenbau, Alois Müller Gruppe with e-con AG, and logistics.
Yes. Heimertingen is a pilot and reference project; further sites are to follow at important transport hubs in Germany and Europe.
About the pilot site, energy, service and market access in southern Germany, Austria and Switzerland – whether you develop commercial vehicles, run a fleet or supply the technology for them.
Site. Reference site in Heimertingen on the A7 and A96
Energy. Up to 1 MW charging power, electricity from the solar park, in progress
Service. Workshop and 24-hour service, being set up
Market access. Direct sales, key accounts, demo vehicles and roadshows
Send an enquiry
Choose your topic and write to us.
Go to the contact form Truck-PowerDest GmbH Alpenstraße 10 · 87751 Heimertingen · Germany +49 (0) 8335 9859-103 info@truck-powerdest.com