AI visualisation of a covered charging park with electric trucks

Everything anelectric truck needs.

Charging, energy, service, sales and fleet – planned and operated by three partners, with one point of contact.

Charging at up to 1 MW per truck charge point. in progress

The high-power charging park in Heimertingen is being designed for e-trucks and other heavy commercial vehicles, with opening planned for 2027. Additional charge points will serve cars. The power will come from Heimertingen.

  • 5 MW grid connection for up to 12 truck charge points
  • Dispensers for MCS, megawatt charging for trucks, and for CCS, today’s widespread fast-charging standard
  • Battery storage
  • Solar power from Heimertingen
AI visualisation: trucks at charge points under a canopy
Charging park

Charging when the truck stops anyway: during the driver break, at the shift change or overnight.

The Heimertingen charging park is being designed for three use cases: intermediate charging during the 45-minute driver break, topping up at the shift change when a truck runs two shifts, and overnight charging during the daily rest. For the short stops it is to deliver up to 1 MW per truck charge point.

Single shift

  1. Drivingup to 4.5 hours
  2. Intermediate charging45-minute driver break
  3. Drivingup to 4.5 hours
  4. Overnight charging9 to 11 hours of rest

Two shifts

  1. First shiftDriving with a driver break
  2. Charging1 to 1.5 hours at the shift change
  3. Second shiftDriving with a driver break
  4. Charging1 to 1.5 hours at the shift change
Schematic, based on the EU rules on driving times and rest periods (Regulation (EC) No 561/2006). In two-shift operation two drivers take turns with the same truck.

Intermediate charging

A quick top-up during the driver break

After 4.5 hours of driving at the latest, EU rules require a 45-minute break. During that time the truck should get as much power as possible. How much it actually takes depends on the vehicle.

  • Up to 1 MW per truck charge point
  • Dispensers for MCS and CCS
  • 24/7 kiosk planned

Two-shift operation

Topping up between two shifts

When a truck runs two shifts, there is no long stop overnight. At the shift change it charges for about 1 to 1.5 hours before the next shift sets off. How much energy it takes in that time depends on the vehicle.

  • Up to 1 MW per truck charge point
  • About 1 to 1.5 hours per shift change
  • Dispensers for MCS and CCS

Overnight charging

Charging during the daily rest

During the daily rest of 9 to 11 hours a truck does not need megawatts. It charges at lower power over many hours while the driver rests.

  • Charging at lower power over many hours
  • Rest area, food and 24/7 kiosk planned
  • Sanitary facilities planned

The power goes where it is needed

The charging park gets a 5 MW grid connection for up to 12 truck charge points. Power cabinets with more than 1 MW are to distribute it as direct current to the dispensers: when only a few trucks charge during the day, each will get a lot of power. When several charge overnight, they share it over the long rest.

Individual charging tariffs for fleets are planned, depending on the charging power needed and the time of day.

How power, storage and charging park connect

Solar power from next door

The charging park is to draw solar power from the 30 MW solar farm about 300 m from the site, with battery storage as a buffer. Talk to us about when and where your fleet needs to charge.

Discuss your fleet's charging needs
Ground-mounted solar arrays near Heimertingen
Photovoltaics near Heimertingen

Power from the field next door.

The 30 MW solar park is 300 m from the pilot site. Solar farm, battery storage and charging park are to share one grid connection point – like solar panels and a battery at home, in the megawatt range. That way power can flow between producers and consumers.

Grid connection point

One shared connection to the grid for generation, storage and consumption

  • Charging park

    Power cabinets with more than 1 MW distribute the power as direct current (DC) to the dispensers for MCS and CCS – up to 12 truck charge points.

  • Solar farm

    30 MW, about 300 m from the site

  • Battery storage

    Large-scale storage, alongside the solar farm

  • Further consumers

    Possible later

AI visualisation: substation with transformers and battery storage between fields
Substation and battery storage

Energy engineering for large grid connections

e-con AG plans, builds and operates energy installations.

  • Distribution, transformation, generation and storage in the MW range
  • Low, medium and high voltage
  • Grid calculation and power quality, protection and control engineering
  • Multi-MW references, largest transformer project at 40 MW

Service that keeps vehicles available. in development

Truck-PowerDest is building its own service operation – with mobile technicians, its own workshop and a 24-hour service.

In-house service

  • Mobile service technicians
  • Own workshop at the Ungerhausen site

Availability

  • 24-hour service

Market access for manufacturers. Support for fleets. in development

Manufacturers get access to defined target sectors, fleet operators get support in switching to electric trucks.

Target sectors

  • Hauliers
  • Freight forwarders
  • Fleet operators
  • Municipalities
  • Waste management
  • Construction
  • Industry

For manufacturers

Market access for your vehicles in the target sectors.

  • Direct sales and key account management
  • Demonstration vehicles and roadshows
  • Heimertingen reference site
Enquire as a manufacturer

For fleet operators

So the switch to electric trucks stays predictable.

  • Telematics
  • Fleet management
  • Financing
Electrifying your fleet? Let’s talk about your routes

Frequently asked questions about charging and service

Short answers for hauliers, freight forwarders, fleet operators and manufacturers.

Question not listed? Write to us
How much charging power will an e-truck get in Heimertingen?

A 5 MW grid connection for up to 12 truck charge points and up to 1 MW per truck charge point are planned. Power cabinets with more than 1 MW each are to distribute the energy as direct current (DC) to the dispensers, depending on how many trucks are charging. The charging park is in progress, with opening planned for 2027. Until then, charging in Heimertingen is not yet possible.

Can I charge my e-truck overnight?

From the opening, planned for 2027: yes. Until then, charging in Heimertingen is not yet possible. The charging park is being designed for overnight charging: during the daily rest of 9 to 11 hours the truck charges at lower power; a rest area, food, a 24/7 kiosk and sanitary facilities are planned at the site.

Can a truck in two-shift operation charge in Heimertingen?

From the opening, planned for 2027: yes. Until then, charging in Heimertingen is not yet possible. When a truck runs two shifts, it charges for about 1 to 1.5 hours at the shift change, with up to 1 MW per truck charge point. How much energy it takes in that time depends on the vehicle.

Are there charging tariffs for fleets?

Individual charging tariffs for fleets are planned, depending on the charging power needed and the time of day. We are not quoting prices yet. Tell us when and where your fleet needs to charge.

Is the 45-minute driver break enough to charge?

How much energy goes in during 45 minutes depends on the truck and its charging curve. The first series trucks for megawatt charging (MCS) charge at up to 750 kW; via CCS it is up to about 400 kW today. The dispensers in Heimertingen are to deliver up to 1 MW per truck charge point. EU rules require the 45-minute break after 4.5 hours of driving at the latest.

What is a power cabinet?

A power cabinet is the power electronics of a charging station, moved into a separate cabinet. From there, direct current (DC) runs to several slim dispensers. This lets the available power be shared flexibly – a lot per truck when only a few charge during the break, less per truck when several charge overnight. It also lets charging parks grow step by step. In Heimertingen, power cabinets with more than 1 MW are to supply the dispensers.

What is the difference between MCS and CCS?

MCS (Megawatt Charging System) is the charging standard for heavy electric trucks, designed for charging power in the megawatt range. CCS (Combined Charging System) is today’s widespread fast-charging standard for cars and many electric commercial vehicles. The Heimertingen charging park will have dispensers for both standards.

Where does the power for the charging park come from?

From the 30 MW solar park about 300 m from the pilot site. Solar farm, battery storage and charging park are to share one grid connection point, so power can flow between generation, storage and charge points. The energy engineering comes from e-con AG, which plans, builds and operates energy installations.

Are there public fast chargers for electric cars in the region already?

Yes, from e-con AG: a fast-charging network for electric cars in the Allgäu – Swabia – Lake Constance region with up to 400 kW, also battery-buffered in rural areas (figures from e-con AG). These charge points are not designed for trucks; electric trucks are to charge at the Heimertingen charging park, with opening planned for 2027.

What service is there for electric commercial vehicles?

Truck-PowerDest is building its own service: mobile service technicians, its own workshop and a 24-hour service. The service is in development.

Who is the offer for?

For vehicle manufacturers seeking market access in southern Germany, Austria and Switzerland, and for hauliers, freight forwarders, fleet operators, municipalities, waste management, construction and industry. Manufacturers reach their customers through direct sales, key account management, demo vehicles and roadshows; fleet operators get telematics, fleet management and financing from a single source.

Vehicles, fleet or technology – let’s talk.

About the pilot site, energy, service and market access in southern Germany, Austria and Switzerland – whether you develop commercial vehicles, run a fleet or supply the technology for them.

  • Site. Reference site in Heimertingen on the A7 and A96

  • Energy. Up to 1 MW charging power, electricity from the solar park, in progress

  • Service. Workshop and 24-hour service, being set up

  • Market access. Direct sales, key accounts, demo vehicles and roadshows

Send an enquiry

Choose your topic and write to us.

Go to the contact form
Truck-PowerDest GmbH Alpenstraße 10 · 87751 Heimertingen · Germany +49 (0) 8335 9859-103 info@truck-powerdest.com